House #39 – Painted Up

House #39 is flying along.  The painter started Tuesday this week and is almost done the inside and about half done the outside.  We should be done at the end of the first week of August and looking forward to getting this house on the market.

I have added some preliminary before and after pictures.  The main things we have left to do are:

Kitchen: we have already bought the cabinets and appliances but they need to be assembled and installed.

Flooring: we were able to save a lot of the flooring on the main floor, but the entire upstairs needs flooring.

Bathrooms: the bathrooms need the most work.  Pretty much everything needs to be completed.

Finish Work: electrical outlets need to be installed, molding needs to be added and the fixtures.

Here are some before and after pictures of our progress to date.